HOW TO CHECK POWER UNIT PRESSURE
(SHUTTLE VALVE LEAK TEST)

It is assumed the pump pressure test has just been completed and pump pressure is OK.

  • Reattach steel tube to shuttle valve. Make sure both steel tube nuts are tight.
  • Make sure the four jack solenoid valve release levers are in the closed position. The levers should be slightly loose when closed.
  • Use the pump run switch to run the pump while monitoring the pressure gauge while the pump is running.
  • Pressure should be between 3400 PSI and 3600 PSI.
  • If pressure is below 3400 PSI: replace the shuttle valve and retest pressure.
  • Disconnect gauge and reconnect/reassemble parts in reverse order of removal.

 

VALVE CLOSED VALVE OPEN
PRESSURE IS BETWEEN
3400 PSI AND 3600 PSI
Cart

Price does not include Shipping - Packaging or Shipping Containers.